New EED rules in Flanders: what does your site need to have in place in 2027?

Audit from 10 TJ, energy management system from 85 TJ and new reporting: this is how Flanders is transposing the EED, and this is what your site needs to do, and by when.

November 20, 2026

7 minutes

Bram De Keulenaere

Industriele energiecentrale bij zonsondergang

Does your site use more than 2.8 GWh of energy a year? Then you will probably face an audit obligation soon. Even if nothing applies to you today.

Flanders is transposing the European Energy Efficiency Directive, EED for short, into the Energy Order (Energiebesluit). The Flemish Government approved the draft in principle on 17 July 2026. The text is not final yet and there is no date for final approval. The direction is clear, though, and the first deadlines already fall in 2027. In this article you read what you need to do, and by when.

In short

  • From 10 TJ per site (± 2.8 GWh a year) you need an energy audit, by 1 July 2027.
  • From 85 TJ (± 24 GWh) you also need a certified energy management system, by 11 October 2027.
  • From 100 TJ (± 28 GWh) a certified energy plan replaces the audit, by 1 October 2027.
  • Profitable measures become mandatory: a payback period under 3 years or an IRR of at least 13%, depending on your consumption.
  • From 10 TJ you report your energy consumption to VEKA every year.

Which obligations apply to your site?

Under the new EED, the size of your company no longer matters. Whether you are an SME or a large enterprise, only the average final energy consumption per site over the past three years counts. The audit threshold drops from 50 TJ to 10 TJ a year, and the separate energy balance is absorbed into the energy audit.

Consumption per siteWhat do you need to do?By when?
10 to 50 TJ± 2.8 to 14 GWhEnergy audit. You implement measures with a payback period under 3 years within 3 years.Audit: 1 July 2027
50 to 85 TJ± 14 to 24 GWhEnergy audit. You implement measures with an after-tax IRR of at least 13% within 3 years.Audit: 1 July 2027
85 to 100 TJ± 24 to 28 GWhEnergy audit + certified energy management system.Audit: 1 July 2027
System: 11 October 2027
100 TJ and more± 28 GWh and moreCertified energy plan + energy management system. Measures with an IRR of at least 13% are mandatory.Plan: 1 October 2027
System: 11 October 2027

Profitable measures become mandatory

What stands out straight away in that table: profitable measures are no longer optional. Below 50 TJ you look at the payback period. Above that, the IRR counts: the annual return an investment delivers over its entire lifetime. If a measure achieves 13% or more after tax, you implement it within three years.

Your audit or energy plan also looks wider than it does today. You also map the cost-effective potential of renewable energy, based on the costs over the entire lifetime. A heat pump running on ambient heat, electric instead of thermal drives, mechanical vapour recompression: if such a measure reaches 13%, it goes on your mandatory list. You also report publicly in your annual report what you implement, together with the percentage of your plan already realised.

Above 85 TJ, an energy management system is added. An audit alone is then no longer enough. ISO 50001 is the logical choice and is explicitly recognised. If you already have ISO 14001 or EMAS, that can also be sufficient, provided it includes a valid audit or a certified energy plan. An energy performance contract only counts under strict conditions: with guaranteed savings, a baseline measurement and agreements on measurement and verification.

New reporting to VEKA

Besides audits and systems, you also report more to the Flemish Energy and Climate Agency (VEKA):

Consumption per siteWhat do you report?How often?
From 10 TJConsumption per energy carrier and application, quantities purchased and supplied, own electricity productionEvery year
From 85 TJHeat demand and waste heat potentialEvery five years, first before 1 April 2027

Over time, the annual reporting replaces the energy data in the Integrated Environmental Annual Report (IMJV). If you already submit the same data through another channel, you can request an exemption. Sites consisting only of non-residential buildings with a valid EPC, or with mainly agricultural activity, are also exempt. Do you have a mixed site? Then the industrial and agricultural parts do count.

Two points that are easily overlooked. Anyone who installs or substantially renovates a fossil combined heat and power (CHP) unit from 1 January 2027 may emit at most 270 g CO₂ per kWh of output. Existing installations are exempt until 1 January 2034 if you submit an emission reduction plan to VEKA. And if a mandatory measure requires a larger grid connection, submit your application to the grid operator within three months of your audit or plan. If you are on time and there is no capacity, VEKA can grant a postponement or exemption. If you are late, you lose that right.

Is EBO3 right for your company?

An energy policy agreement (EBO) is a voluntary agreement between the Flemish government and energy-intensive companies. Does your site use 85 TJ or more? Then you can join the new EBO3 (2027-2030), by 31 March 2027 at the latest. Joining later is possible in January 2028 and January 2029.

Without EBO3With EBO3
Who it is forEvery site from 10 TJSites from 85 TJ, voluntary
Profitable fromIRR of 13% (below 50 TJ: payback period under 3 years)IRR of 11%
FlexibilityImplement profitable measures within 3 yearsReplace a measure with an alternative delivering the same savings, waste heat recovery or a CO₂ measure with double savings
What you do extraAudit or energy plan, energy management system from 85 TJAction plan and energy expert by 1 April 2027, annual reporting by 1 May, climate roadmap for ETS companies
What you get in returnNoneYou automatically meet the Flemish obligations for audit, energy plan and energy management system, and Flanders imposes no additional energy or climate obligations on you
EBO3 is not a default choice. The bar is higher, but you get more flexibility and legal certainty in return. Whether it pays off depends on your package of measures and your investment capacity.

Which deadlines should you put in your diary?

Now
Map your consumption per siteEvery site from 10 TJ
31 March 2027
Join EBO3From 85 TJ, voluntary
1 April 2027
First reporting of heat demand and waste heatFrom 85 TJ
1 July 2027
Valid energy audit10 to 100 TJ
1 October 2027
Valid certified energy planFrom 100 TJ
11 October 2027
Certified energy management systemFrom 85 TJ
Legal deadlineVoluntary or recommended

Does your site cross a threshold later? Then you get your own deadline. For example, you submit an audit within the first six months of the year after you exceed 10 TJ.

How do you tackle it now?

Do not wait for the final text. You do not set up an energy audit or ISO 50001 project in a few weeks. Start with the question of whether your site falls under a threshold:

  1. Collect your consumption per site for 2023, 2024 and 2025: electricity, natural gas, heating oil, steam and other fuels.
  2. Convert everything to the same unit. 1 MWh is 0.0036 TJ. So 10 TJ is about 2,778 MWh.
  3. Take the average over three years, not just your latest year. That way, one exceptional year does not simply push you over or under a threshold.
  4. Compare each site separately with the thresholds of 10, 50, 85 and 100 TJ. Two sites of the same company can fall under different rules.

A worked example. A site uses on average 2,000 MWh of electricity and 1,500 MWh of natural gas a year. Together that is 3,500 MWh, or 3,500 × 0.0036 = 12.6 TJ. That site is above 10 TJ and therefore needs an energy audit by 1 July 2027.

Do you know which threshold you fall under? Then check what you already have. With ISO 14001, EMAS or an ongoing energy plan, you may already cover part of the obligations. Do you expect measures that need more electricity, such as a heat pump? Then plan your grid application alongside them. And if you are above 85 TJ, decide before the end of March 2027 whether EBO3 pays off for you.

[TO BE COMPLETED BY BRAM, REMOVE THIS LINE BEFORE PUBLICATION: 2 to 3 sentences from our own projects. For example, where companies get stuck collecting consumption data per site, or which measures in audits often reach the 13% IRR.]

Mantis Consulting maps, per site, which threshold you fall under and which deadlines apply to you. We carry out your energy audit or energy plan and guide you towards a certified energy management system in line with ISO 50001. That way you know what you need to do, and which measures really pay off for you.

Frequently asked questions about the EED in Flanders

Does the consumption of my company or of my site count?

That of your site. The thresholds apply per site, based on the average final energy consumption over the past three years.

How much is 10 TJ?

About 2.8 GWh or 2,778 MWh a year, all energy carriers combined: electricity, gas, heating oil, steam and other fuels.

Does my current energy audit or energy plan remain valid?

Yes. Existing audits, energy balances and energy plans remain valid until their end date. The new rules apply at the next update.

Is ISO 50001 mandatory?

From 85 TJ you need a certified energy management system. ISO 50001 is explicitly recognised. ISO 14001 or EMAS also works, if it includes a valid audit or a certified energy plan.

Which measures from my audit do I have to implement?

Between 10 and 50 TJ you implement measures with a payback period under 3 years. From 50 TJ, measures with an after-tax IRR of at least 13% are mandatory. In EBO3 that threshold is 11%. In each case you have 3 years.

What if the electricity grid holds back my measure?

Submit your application for a new or larger connection within three months of your audit or plan. If there is then no grid capacity, VEKA can grant a postponement or exemption on a reasoned request.

When will the Flemish transposition of the EED be final?

That is not fixed yet. The Flemish Government approved the text in principle on 17 July 2026. The dates in this article may still change.

Which threshold does your site fall under?

We compare your consumption per site with the thresholds and draw up a step-by-step plan towards 2027.

About the author
Bram is co-founder of Mantis Consulting and a strategic advisor at the intersection of energy, climate, and product sustainability. Building on a strong technical foundation in energy optimization, he began guiding organizations through complex issues concerning energy efficiency, CO₂ reduction, and life cycle assessments (LCA). Thanks to his in-depth knowledge of both the operational and strategic aspects of sustainability, he enables large and medium-sized enterprises to structurally reduce their ecological footprint and create future-proof value.